Complete Centre Loom with Hoop Ring Assembly, Reed Ring Assembly, Bearing Block – Belt Assembly, Cam Assembly, 06 No’s, Shuttle Assembly, Compensator Assembly, as shown in accompanying catalogue. A suitable Take up frame structure only on which will be mounted the old Take up Assembly to take your take up pillars outside and accompanying hardware. Main Motor Inverter in a separate panel box which will be synchronized with your existing Main Control panel
ABOVE ASSEMBLY DOES NOT INCLUDE FOLLOWING ITEMS AND WILL BE USED FROM YOUR OLD LOOM
Creel Assembly along with Adopters, Eyelet Brackets etc Main Loom Frame, Platforms, Guide Rollers, Intake Roller, Combs etc Take up Gear Box, Pick Gears, Take up Pillars and Take up Roller Assembly, Cloth Winder Assembly complete with Drive & Motor. Main Motor & Main Control Panel, Magnetic Weft Stop Motion, Caliper Cone assembly – Cloth Spreader Assembly
A) Approx 2,700 * meters/day on 10 x 10 mesh at 900ppm.
B) Approx 3,000 * meters/day on 10 x 10 mesh at 1000ppm
* (Assuming 700 to 800 denier tapes on good quality bobbins with 18 – 20% elongation and 3.0-3.5 kg breaking strength)
Circular Loom
Cheese Winder